SafeSight.AI
INCIDENT OPS
Facility Plant 07 · Auburn Hills, MI
Cameras Online 47 / 48
LIVE · 14:32:07

Incident log

LAST 24 HOURS · 23 EVENTS · 2 UNACKNOWLEDGED
Clip ID Time Label Location Notes Conf. Severity Status
Select an incident
Click any row in the incident log to review the AI-generated report, snapshot, and operator notes.
INC · SS-20260424-1432-07
Medical collapse — Assembly Line 3
Detected At
14:32:07.218
Camera
CAM-03-AL3
Model
Vision + Pose
CAM-03-AL3 · ASSEMBLY LINE 3
REC
2026-04-24 14:32:07.218
Auto-Generated Incident Report AI Assistant
Summary
Worker observed in horizontal posture on the floor near Station 3B for more than 3.2 seconds. No prior fall motion detected in adjacent frames, consistent with sudden medical collapse rather than trip/slip event.
Severity Assessment
CRITICAL — potential medical emergency requiring immediate response. Recommend medic dispatch.
Recommended Immediate Action
1. Dispatch plant medic to Assembly Line 3, Station 3B. 2. Notify Shift Supervisor (J. Martinez). 3. Pause adjacent conveyor via interlock C-14. 4. Preserve 30-second video clip for incident review.
Regulatory Reference
OSHA 1910.151 (Medical Services & First Aid) · 29 CFR 1910.38 (Emergency Action Plans)
Preventive Measure
Review recent shift rotation and temperature exposure logs for Worker ID 4059. Consider welfare check protocol for solo operators in Zone AL3 during extended shifts.
Operator Notes 1
Medic en route. Supervisor acknowledged. Worker 4059 on 10th consecutive hour per HR log. Pending on-scene assessment.
ADDED BY M. KRISHNAN · HSE DUTY 14:32:41

Operations analytics

TRENDS ACROSS THE LAST 30 DAYS
Total Incidents
Critical
Avg Resolve
minutes
High-Conf Rate
≥ 90% confidence
Daily incident volume
Critical High Medium Low
Severity mix
events
Hour-of-day heatmap by zone
Top event types
Top zones
Insights
AI Assistant

Live feeds

Real-time camera grid across all 47 monitored cameras at Plant 07. Filter by zone, click a tile to expand to full-screen with detection overlays.

Coming in v3.3

Compliance center

PLANT 07 · AUBURN HILLS · ISO 45001 CERTIFIED · FY26 · YEAR TO DATE
YTD Recordables
6
↓ 25% vs FY25
PPE Compliance
96.4%
↑ 2.1 pp QoQ
Camera Uptime
97.4%
38 of 39 cameras
Open Audit Findings
3
2 medium · 1 low
Safety milestones
142
days since last lost-time injury
Best on record · 156 days (FY24)
38
days since last recordable
90+ days = excellent class
12
days since last critical event
Last: medical collapse · AL3
OSHA Form 300 · log of work-related injuries & illnesses
YTD recordable cases · Plant 07 · 2026
Case # Date Worker ID Job Title Location Injury / Illness DA / Restr Classification
PPE compliance by type
≥ 95% 90 – 95% < 90%
Camera coverage status
ZoneOnlineCoverageStatus
Audit trail · operator actions
Certifications expiring (next 60d)
WorkerCertificationExpiresDays
Data retention & privacy
Export packages
OSHA Form 300A
Annual summary of recordable injuries. Required posting Feb 1 – Apr 30 each year.
Quarterly HSE Report
Stakeholder summary: incident counts, trends, compliance rates, action items.
Insurance Audit Package
Bundle for property & casualty carrier — incidents, evidence clips, training logs.
Custom range export
Pick a range and select what to include. Outputs an archive (CSV + clips + redaction log).
EDGE INFERENCE · 28 FPS/CAM
KAFKA · 142 EVENTS/MIN
VLM API · 312ms P50
STORAGE · 73% (412TB / 560TB)
MODEL · SAFESIGHT-v3.2 BUILD · 2026.04.24-r7 OPERATOR · M. KRISHNAN